Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | CSTY |
Model Number : | CSTY-TB |
Certification : | ISO9001 |
Price : | 28-50USD/Kg |
Payment Terms : | T/T, L/C or Negotiation |
Supply Ability : | 50Ton per month |
Delivery Time : | 15-30days |
TA10 Grade 12(Ti-0.8Ni-0.3Mo) Titanium Welded Pipe For Chemical Equipment And Tanks
Density | 0.163lb/in3 |
Coefficient | 15x106psi |
Beta transformation temperature(+/-25oF) | 1635F-1735oF |
Thermal conductivity | 13-10Btu/ft·h·°F |
Coefficient of thermal expansion(32-600oF) | 5.1x10-6/oF |
Melting point | ~3000oF |
FAQ
1. Are you the manufacturing or trading company?
Real manufacturing company, started from 2001, nearly 20 years.
With 2 sales teams for foreign trading business, started from 2008,
more than 10 years experiences.
2. Do you have a dedicated R & D team? Can you design a product for
us?
We have a dedicated technical team responsible for research and
development. But most of titanium fittings are standard, we can
follow ASTM or other you asked.
3. Can you provide samples? Is there a charge?
Samples can be provided for a fee.
4. What is your payment method?
We can accept T / T, LC, trade assurance order from alibaba.com.
Samples are 100% prepaid. Orders for mass production are below 1000
USD, 100% prepaid, above 1000 USD, 30% prepaid, and 70% paid before
delivery.
5. How long is your delivery time?
Inventory samples: within 3 working days Products for bulk orders:
25-30 days under normal circumstances.
6. After-sales products, how to deal with problems?
Based on our statistics for each year, the probability of problems
with titanium products is around 0.8%. There are two main reasons
for the problem:
1) Among the products that have problems, 93% are misplaced in
pre-sales communication, and the product that the customer needs is
not really clear.
2) 5% is an unexpected situation and the extension of the
construction period.
3) 2% is the problem of transportation and packaging. During
long-distance transportation, the packaging is damaged and the
surface is damaged.
7. What is your company's response to the product in question?
1) Verify and blame for pre-sales communication issues. Compensation is handled according to the proportion of liability.
2) We are 100% responsible for problems caused by damaged packaging
during transportation.
Tag:Titanium welded tube,tube pipe in titanium.titanium pipe
![]() |